Looking for some information on how to edit job registration entry in Dynamics AX which is incorrect, I did not find much information. So, I decided to blog about how to do it. First, the ‘disclaimer’. There are many parameters which need to be set up and will affect the way job registration works. I am going to concentrate on how to edit a worker who did not sign in on time or failed to sign out. I will also show the effect on the production order after the edits.

I created a worker in the Contoso environment with my name and started work on production order P000152 working on front speaker assembly (operation 10) and later the grill mounting or operation 20. Well, I did not clock in until almost 11 a.m. I should have clocked in when I started at 8 a.m.

The route journal has an entry for the .07 of time I entered. Here is the route journal:

Here is the route journal with an entry for the .07 of time entered.

Let’s go to HR to review the time entry (Human resources -> Common -> Time and attendance -> Calculate). I selected the date (date or week) and calculation group I want to review and click OK. Because there were some clock ins prior to my starting, it looks a bit messy.

Job registration edits in Dynamics AX

If you are unable to edit the window after it has been calculated, just uncheck the calculated box for the day to clear all workers, or if per day, then you can uncheck it per worker. Well, looking at the activity, there were two clock ins for the Speaker assembly and one for the Front grill mounting. I did eight hours of work for the day, but time registration only shows .10 total. We can go in and edit those times.

First, we need to adjust the Clock in time at the top by clicking in the grid or going to the Times tab. I will remove some of the clock ins and outs which are not relevant. Secondly, we need to make sure things flow chronologically. Job registration will fill in any missing times (even if seconds) with indirect time.

A couple of things to note are:

  1. Format of the times. They must be in HH:MM:SS Xm format.
  2. You can change the Reference field to a different production order or project if logged to the incorrect one. There is a drop down to select from. The list will be a full list so it is not specific to the jobs or projects the worker was assigned.
  3. You can also edit fields such as the:

a. Resource or operation logged into on the general tab.
b. Financial Dimensions
c. View any errors on the Error tab.
Once the edits are complete, the window will now look like the one below.

Job registration edits

To get the time to reflect the correct extended time, a calculate needs to be run again. This can be done by clicking Update -> Calculate. During my edits, I inadvertently left in some double clock-ins. I removed the Clock ins and Clock outs during the day so I have a clock in at 8 a.m. and a clock out at 5 p.m. After removing my duplicates and getting a successful calculate, my window now looks like this:

Once removing the duplicates and getting a successful calculate, the window now looks like this.

Notice how the small unaccounted-for times will populate with indirect activity. My time registration is now ready to be approved and transferred. I went in and approved and transferred the time registration. Let’s go back to our route card journal and see what transpired.

The updated route card journal.

Notice how the .07 time I entered has been backed out and corrected with my job registration edits.

Related Posts

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

Upcoming Events

september

02sep10:00 am10:30 amThe Modern Manufacturer - Cycle Count Management

02sep12:00 pm12:30 pmBest Practices for Work Order Planning and Routing for Field Service Companies

09sep10:00 am11:00 amWhat is Levridge? An Overview of the Ultimate Ag Solution

09sep12:00 pm12:30 pmOverview of Microsoft Promotion for NAV and GP Clients

10sep11:00 am12:00 pmConfab with Stoneridge - Livestream - Field Service Comparisons

16sep10:00 am10:30 amThe Modern Manufacturer - Product Lifecycle Management

16sep12:00 pm12:30 pmHow to Upgrade to Dynamics 365 Finance and Operations: Examining Custom Code and ISV Implications

16sep2:00 pm2:30 pmScheduling and Dispatching for the Modern Field Service Company

23sep12:00 pm1:00 pmDynamics 365 Business Central Wave 2 Release Preview - An Overview of the Most Exciting New Features Coming in October

24sep11:00 am12:00 pmConfab with Stoneridge - Livestream - The Modern Workplace: Teams, Sharepoint, Outlook, Office, and AI Integration

30sep10:00 am10:30 amThe Modern Manufacturer - Return Management

30sep12:00 pm12:30 pmEmpowering Your Field Service Technicians with a Mobile Solution

october

07oct12:00 pm1:00 pmThe Three Paths to Business Central from Dynamics GP

08oct11:00 am12:00 pmConfab with Stoneridge - Livestream - The Vision and Strategy of Microsoft Business Systems

14oct10:00 am10:30 amThe Modern Manufacturer - Complex Cost Modeling

14oct12:00 pm12:30 pmGenerating Custom Inspection or Process Forms

19octAll Day22Stoneridge Connect Fall 2020

22oct11:00 am12:00 pmConfab with Stoneridge - Livestream - Stoneridge Connect Recap

28oct10:00 am10:30 amThe Modern Manufacturer - Engineering Change Orders

About Stoneridge
Stoneridge Software is a unique Microsoft Gold Partner, with emphasis on partner. With specialties in Microsoft Dynamics 365, Microsoft Dynamics AX, Microsoft Dynamics NAV, Microsoft Dynamics GP and Microsoft Dynamics CRM, we focus on attracting the most knowledgeable experts in the field to our team, and prioritize delivering stellar solutions with maximum impact for your business. At Stoneridge, we are deeply committed to your results. Each engagement is met with a dedicated team, ready to provide thorough, tailored, and expert service. Based in Minnesota, we intentionally “step into your shoes,” wherever you are. We focus on what you care about, and develop trusting, long-term relationships with our clients.

Subscribe To Our Blog

Sign up to get periodic updates on the latest posts.

Thank you for subscribing!

X